Steel halls and structures on screw pile foundations
Light steel (LSF) and heavy steel (IPE/HEA) structures, complete installation with our own equipment.
Suitable for
Concrete scenarios where this solution works well.
Light hall (LSF)
A lightweight structure of cold-rolled profiles, fast, efficient, for medium areas.
IPE or HEA structure
Heavy steel for large spans, high loads or industrial structures.
Warehouse or logistics space
A functional structure, installed quickly, without complex concrete works.
Extension or superstructure
We add a steel structure over an existing foundation or an existing space.
What’s included
What you get when you work with Martetic on this solution category.
- Site assessment and structural specifications
- Foundations adapted to the structure's loads
- Steel structure installation with our own equipment
- Welding and mechanical joints
- Transport, crane if needed
- Verification and handover

How it works
The main steps from order to handover, for this category.
Assessment and specifications
We understand the structural requirements, spans and loads.
Foundations
Screw or classic foundations, adapted to the structure's load.
Structure installation
Posts, beams, bracing, installed with our own machinery or a crane.
Verification and handover
We check the geometry, fixings and alignment. We hand over ready for enclosures or installations.
Advantages
What makes this solution better than the classic alternatives.
In-house execution
We do not subcontract the installation. Our team carries out the welding and assembly.
Integrated logistics
Transport, crane, Bobcat, everything coordinated from one place.
Fast compared to classic construction
Steel structures installed in days, not weeks.
Adaptable to specifications
LSF for light structures, IPE/HEA for heavy loads: we choose the right material.
Products that may be considered
The options below are a starting point. The final selection is confirmed after the structure, ground, loads, connection and installation conditions.
M89, M114, V114 or Custom, depending on spans and loads
What you need to send us
The location, dimensions, the sketch or plan, known weight or loads, photographs of the ground and the desired deadline.
What we check
The ground, access, bearing points, the connection to the structure, vertical and lateral loads and the possibility of installation.
Frequently asked questions
What customers usually ask about this category.
LSF (Light Steel Frame): thin profiles, light structures, suitable for small halls and light residential construction. IPE/HEA: heavy steel, for large spans and high loads.
Yes. We build foundations adapted to the structure's load, screw or classic, depending on the project.
For structures with large spans or significant loads, yes, we recommend a design. We work with partner engineers.
It depends on size. A 100–200 sq m structure: a few days. We plan a realistic deadline in the proposal.
Yes. We add a steel structure to an existing foundation or structure, if it allows.
Related guides
- Are Screw Piles Certified? CE, DoP, EN 1090, EPD
What CE, DoP, EN 1090, ISO 1461 and EPD mean for screw piles and which documents you should receive for the product and its installation.
- How Many Screw Piles Do You Need? Spacing & Examples
How many screw piles a building needs: no fixed rule per m², what sets the number of points, spacing, load path and worked examples.
Describe your project
Tell us what you want to install and where. You receive a clear proposal with options.
No obligations. No hidden costs.
Request a proposal