Site setup

Relocatable foundations for
site setup

We can install bases for containers, temporary lighting, fencing, signage and equipment. On relocation, the foundations can be extracted, inspected and, if the condition of the products and the new project allow, reused.

Mechanised installation

Reduced local works

Immediate use

After checks

Removal possible

Mechanical extraction

Verified reuse

Subject to condition

Comparison

Classic concrete or screw foundations, at every relocation

Concrete is poured anew at every site. Screw foundations can be unscrewed, transported and, after inspection, reinstalled.

Concrete — at every site

Ground excavation
Reinforcement + formwork
Pouring + stripping the formwork
Curing, minimum 28 days
Hydration
Landscaping / ground restoration
!

On relocation: concrete elements are hard to remove and a new foundation is required.

Screws — mechanised installation

Mechanical installation, in hours, not weeks
Construction possible immediately after installation, if the checks allow
No extensive digging, no concrete pouring
On relocation: you unscrew and transport
Reuse possible, after checking the product
$

Point installation, with reduced local works.

Process comparison

Concrete: 8 stages. Screws: 2 main stages.

The traditional process depends on the weather and requires curing time. Mechanised installation reduces the number of stages until the structure is usable.

CONCRETE

Depends on weather conditions

Excavation
Reinforcement
Formwork
Pouring
Stripping
Curing
Hydration
Landscaping

8 stages · Weeks of waiting

SCREWS

Installation independent of concrete curing

Installation
Construction

2 main stages · Hours, not weeks

🚛

Hard-to-reach areas

⛰️

Sloping or soft ground

🌧️

Installation possible in most weather conditions

🌿

No extensive digging, no concrete

💰

Offer with a clearly estimated cost

Relocation

Relocatable foundations for several sites

Foundation screws can be extracted mechanically and, after checking the product’s condition and its compatibility with the new project, reused at another site.

Site 1

Concrete

Complete foundation, poured on site

Full foundation cost

Screws

Supply and mechanised installation

Product purchase + installation

Site 2 (relocation)

Concrete

Demolition + new foundation

You pay again for a complete foundation

Screws

You unscrew, transport, inspect

Cost: transport + reinstallation

Later sites

Concrete

Every time: a new foundation

The cost repeats with every move

Screws

Reuse possible, after inspection

Subject to the product’s condition

The concrete foundation is poured again at every relocation.Foundation screws can be extracted, inspected and reused, if the product’s condition and the new project allow.

Services

What we install for site setup

Solutions from ground preparation to handover of the structure, on screw foundations.

Site setup platforms

Levelled, stable surfaces for material storage, work areas or equipment.

Supports for office / storage containers

Levelled steel bases for containers, ready for use after installation and checks.

Site signage

Identification panels, information totems and signs installed on anchored steel supports.

Technical equipment supports

Bases for generators, HVAC and units, anchored in the ground, with the option of relocation.

Fast installation between stagesOwn equipmentA single point of contactRelocation possible, with inspection

Comparison

Why screw foundations, not concrete?

AspectClassic concreteWith Martetic
Installation timeWeeks (minimum 28 days of curing)1–2 days, usually
Concrete foundationMandatoryNot required
Ground impactExcavation, formworkPoint installation, mechanised
CoordinationMay involve several subcontractorsA single point of contact
RelocationDemolition + new foundationWe unscrew and inspect
ReuseNo, it stays in the groundPossible, after inspection
Final costMay increase with unforeseen worksStated in the offer, with assumptions and exclusions

Mechanised

Installation and removal

100%

Recyclable steel

Verified

Reuse

Clear

Cost from the offer

Capabilities

Our own equipment and technologies

In-house execution, no subcontracting for the main operations.

Own equipment

Hydraulic installer, installation of steel foundations
Setting-out laser, precision levelling and alignment
Bobcat, earthworks and on-site internal transport
Specialised trailer, equipment transport
Crane, coordinated from the project, when needed

Joining technologies

TF multi-nail joints, structural timber frames
MIG/MAG welding, LSF, IPE, HEA structures
Installation of lightweight steel structures (LSF)
Installation of heavy steel structures (IPE/HEA)
Transport and complete logistics

Workflow

How we work - the Martetic process

The process adapts to what you need: only products, products and installation, or a broader solution.

01

We understand the project

You send us the structure, dimensions, support points, location, deadline and the information available about the ground.

02

We choose the configuration

We determine the family, diameter, length, thread, flange, connection parts and the services needed.

03

We confirm the offer

The offer specifies the products, quantities, transport, services, assumptions, exclusions, deadline and handover documents.

04

We prepare the works

We confirm the setting-out, utilities, access, materials and machinery. Local groundworks are included only if they appear in the offer.

05

We supply or install

We deliver the products to the client's team or carry out mechanised installation with control of position, level and verticality.

06

We verify and hand over

We hand over the available parameters, the contracted tests, the acceptance report and the documents provided for in the offer.

Quoting

What you receive in the offer

Products

Standard or configurable

Installation

Mechanised, with position/level control

Documents

Provided for in the offer

100%

Recyclable steel

The offer specifies the products, services, quantities, assumptions and exclusions.
Conditions not initially identified are discussed before any additional works.

Frequently asked questions

What contractors ask about site setup on screw foundations.

It depends on the product's condition and the new project. Foundation screws are unscrewed mechanically and, after inspection, can be reinstalled. Galvanised steel resists corrosion well, but reuse is confirmed each time, not assumed automatically.

Usually 1–2 days for a platform or a set of supports. A concrete foundation requires, by comparison, excavation, formwork, pouring and a minimum of 28 days of curing. With screw foundations, construction can continue immediately after installation, if the checks allow.

You unscrew the foundations mechanically and transport them to the new site. Reuse takes place after checking the product's condition and its compatibility with the new project. The main cost on relocation is transport and reinstallation.

On most ground types, yes: clay, sand, stone, sloping ground or hard-to-reach areas. We assess the site before installation and choose the right diameter and length for each situation.

Working and storage platforms, supports for containers (office and storage), bases for technical equipment (generators, HVAC) and site signage (panels, totems). All on screw foundations.

The cost depends on the product, ground, access and quantities. On first use, screw foundations are usually more advantageous than concrete, especially in the short term. On relocation, the difference grows: with concrete you pay again for a complete foundation; with screws you pay for transport and reinstallation.

Let’s discuss your project

Describe what you need on site and where. You receive a clear proposal with options.

No obligations. We reply the same day.

Call nowSend your project
Message us on WhatsApp