MARTETIC develops screw-foundation concepts for BESS equipment, auxiliary infrastructure and temporary site works — with particular value where weak upper soils, high groundwater or repetitive civil work make conventional foundations difficult to execute.

The strongest candidates are sites where the foundation package is becoming disproportionate to the equipment it supports — especially when the same detail repeats dozens of times.
Where a competent layer exists deeper, a modular foundation may allow the weak upper zone to be crossed rather than used as the bearing layer.
Potential to reduce selected open foundation excavations and wet civil operations, subject to project-specific groundwater and corrosion checks.
A repeatable support detail can turn a one-off foundation idea into an installation system across a BESS block or whole site.
Site offices, lighting, fences, gates and selected technical structures can be designed for demounting or relocation where the project requires it.
Select a numbered area to see where MARTETIC can be considered. Not every element needs the same foundation strategy.

For difficult sites, the real engineering question is whether the weak upper zone can be crossed and a suitable deeper layer can be engaged at a practical depth.
Uncontrolled fill, topsoil, soft clay, organic soil and loose / saturated sand are treated as problematic. They require additional investigation, extra depth, local improvement or project-specific verification.
Preliminary capacity ranges only become relevant when the soil scenario and working depth are supported by the actual geotechnical information.
BESS and auxiliary structures may use screw foundations while heavy transformers, crane areas or OEM-mandated details remain conventional.

The concept uses a screw tip, one or more extensions and a separate structural flange. Exact product configuration and documentation are confirmed for the contracted project.
The structural interface follows the equipment support geometry. A steel IPE/HEA frame is introduced only where it is useful for load distribution, level control or OEM interface requirements.
The foundation system is delivered as an installation scope, not simply as loose components. Access, tolerances and available installation records are defined before execution.
Settlement, uplift, lateral loads, moments, group effects and corrosion are checked for the actual project. If verification testing is required by the designer or beneficiary, it is treated as a separate specialist project scope.
Screen the project before detailed civil engineering is committed.
A controlled supply-and-installation scope for the selected foundation points.
Where required, the foundation package can extend beyond the screw itself.
GA, reactions, geotechnical profile and site constraints.
GO / HYBRID / NO-GO and an indicative foundation strategy.
Support points coordinated with equipment, steel and site services.
Mechanised installation, depth / position control and structural interface.
Scope-specific records and project documentation.





For a BESS project, the useful question is not only whether a ground screw exists. It is whether the complete foundation interface can be installed, controlled, documented and integrated into a repeatable construction sequence.

MARTETIC combines ground-screw products with installation equipment, site set-out and levelling capability, local site preparation, transport coordination and structural connection solutions. The exact project scope is defined before mobilisation.
Installation equipment and reducers are selected for the screw diameter, length, required installation torque, ground conditions and site access.
Mechanised installation makes repetitive BESS grids commercially interesting. Daily productivity is established for the actual product configuration, soil, spacing, access and site logistics rather than promised as one universal number.
The installation process checks the support axis, plan position, final level and verticality. After installation, the model, position, depth, level and available installation parameters can be recorded according to the contracted scope.
Where required by the designer, EPC or beneficiary, compression and uplift testing — and, where relevant, lateral testing — can form a separate specialist project scope. The test measures load–displacement response; the measured result does not automatically become the design load.
Depending on the exact selected product and contracted package, project documentation can include technical identification, DoP / CE information where applicable, traceability, fabrication / galvanizing documentation, installation records and a testing report when testing is contracted.
Laser set-out and levelling, Bobcat-supported local site work, product / equipment transport, unloading coordination and custom steel connection pieces can be integrated where they are part of the agreed project scope.
For a real tender, MARTETIC can define an indicative production rate after the screw type, depth, ground, spacing, access, number of repeated points and logistics are known. That gives the EPC a usable programme assumption instead of a generic marketing number.
Indicative daily installation rate · required equipment · access envelope · installation sequence · control / records · steel interface · documentation package · optional testing scope.
| Interface | Typical MARTETIC contribution | Project team input |
|---|---|---|
| Ground | Foundation family / depth concept and installation scope | Geotechnical documentation, groundwater and site constraints |
| BESS equipment | Foundation layout coordinated to permitted support geometry | GA, reactions, anchoring and tolerance requirements |
| Steel interface | Flange / frame concept where included in scope | Structural design basis and OEM restrictions |
| Construction | Installation methodology, equipment and agreed records | Access, sequencing, work areas and HSE requirements |
| Verification | Product and installation documentation within contracted scope | Project-specific design acceptance; specialist testing if required |
The value may be in crossing a weak upper layer to reach a suitable deeper stratum. If that stratum does not exist at a practical depth, the concept may not be suitable.
Published figures are preliminary ranges with declared soil and depth assumptions. Final project values are not copied from a catalogue.
The goal is a better site-wide foundation strategy. A technically sound hybrid solution is preferable to forcing one technology onto every equipment type.
We can determine whether the site deserves a screw-foundation concept, a hybrid comparison or a conventional solution before significant engineering effort is spent in the wrong direction.
MARTETIC · NZEB GROUP SRL
+40 720 452 788
martetic.com
Useful files for a first review:
• General arrangement / support drawing
• Equipment mass and support reactions
• Geotechnical report and groundwater information
• Site layout, access and conventional concept if available